Tregunter Road, Kensington
Scope:
Design for the complete refurbishment and subterranean construction of large basement for the full footprint of the existing building, including temporary works.
Engineering Challenges:
- Extension of the basement below the side, front and rear walls requiring the removal of existing foundations and installation of new supporting structure.
- Temporary works design and methodology to limit movement and safeguard the existing building during the extensive excavation works
Architects: LAB Architects



